Bus 1 represents the grid connection which has negative active power
because the active power from PV is larger that the load active power.

Στις 24 Νοε 2016 07:38, ο χρήστης "Saranya A" <[email protected]> έγραψε:

> I ran the "casePV3" and observed that bus 1 which is slack bus has Pg as
> -3MW. Can a bus which has photovoltaic unit as generator observe real
> power? I am not pretty aware of the power electronics of it. I think if you
> can reason that out you may get some direction.
>
> Regards,
> Saranya A
>
> On Thu, Nov 24, 2016 at 4:08 AM, Alexandros Gesios <
> [email protected]> wrote:
>
>> Ι made some changes in the matrices and OPF completes but I do not think
>> that it allocates the reactive power among the PVs in an optimal way
>> regarding the losses.
>> The last three PVs absorb Qm reactive power while the other operate in a
>> unity power factor.
>> I attach the case in order to be more specific. Also the network is
>> radial.
>>
>>
>> 2016-11-23 20:46 GMT+02:00 Alexandros Gesios <[email protected]>
>> :
>>
>>> Dr. Zimmerman
>>>
>>>
>>> I applied the change you have mentioned and the result is the following:
>>>
>>>
>>> MATPOWER Version 6.0b1, 01-Jun-2016 -- AC Optimal Power Flow
>>> MATLAB Interior Point Solver -- MIPS, Version 1.2.1, 01-Jun-2016
>>>  (using built-in linear solver)
>>> Numerically Failed
>>>
>>> Did not converge in 9 iterations.
>>>
>>> >>>>>  Did NOT converge (0.11 seconds)  <<<<<
>>>
>>>
>>>
>>>
>>> 2016-11-23 19:54 GMT+02:00 Ray Zimmerman <[email protected]>:
>>>
>>>> I think you want to change the first column of your gencost entries to
>>>> 2 (polynomial) instead of 1 (piecewise linear). Hopefully, that fixes your
>>>> problem and it will solve.
>>>>
>>>>    Ray
>>>>
>>>> > On Nov 23, 2016, at 10:30 AM, Alexandros Gesios <
>>>> [email protected]> wrote:
>>>> >
>>>> > Hello to everyone
>>>> >
>>>> > I am new to MATPOWER and I am trying to operate an OPF analysis in a
>>>> MV grid constisted of two feeders.
>>>> > The first feeder has 10 inductive loads and the second feeder has 10
>>>> photovoltaic units and their are connected to the grid by the slack bus.
>>>> > What I want to achieve is loss minimization by allocating the
>>>> reactive power among the photovoltaic units in a optimal way. The nominal
>>>> active power of the PV units is 10.6 MW and the load is 6 MW so the extra
>>>> active power is being absorbed by the HV/MV Grid.
>>>> > Also I want the slack bus to operate at constant 1.05 pu voltage so
>>>> in the mpc.bus slack bus has voltage limits Vmax=Vmin=1.05.
>>>> > Also I want the PV units to operate in nominal power so in mpc.gen
>>>> their active power limits are Pmax=Pmin=Pnom.
>>>> >
>>>> > Finally the mpc.gencost matrix constists of 11 rows and every row has
>>>> these elements     1    0       0       2       2   4; because I read in
>>>> the archive that in order to achieve loss minimization you need the same
>>>> linear costs in the gencost matrix.
>>>> >
>>>> > When I run runopf(mycase) I take the following errors
>>>> >
>>>> > Index exceeds matrix dimensions.
>>>> >
>>>> > Error in opf_setup (line 84)
>>>> >   x1 = mpc.gencost(pwl1, COST+2);
>>>> >
>>>> > Error in opf (line 198)
>>>> > om = opf_setup(mpc, mpopt);
>>>> >
>>>> > Error in runopf (line 75)
>>>> > [r, success] = opf(casedata, mpopt);
>>>> >
>>>> > Also, I would like to ask whether my problem can be formulated in
>>>> MATPOWER.
>>>> >
>>>> >
>>>> > Thank you in advance
>>>> >
>>>> >
>>>> > Alexandros Gesios
>>>>
>>>>
>>>>
>>>>
>>>
>>
>

Reply via email to