Hi Shri, Thanks for the very helpful response. Yes, I got it working. One problem I am facing, is that for some cases after the running of the cpf, it is saying "CPF TERMINATION: Corrector did not converge in 10 iterations", suppose in the attached <https://drive.google.com/open?id=0BzHW_Oh9YrAfY0gwQ0xTNGJHVzg>case (modified 14 bus case, only the line impedances are changed).
So in this case is there anyway I can increase the number of steps for the cpf? Thanks Mahi On Wed, Feb 22, 2017 at 11:16 AM, Abhyankar, Shrirang G. <[email protected]> wrote: > Hello Mahi, > basecasedata is a MATPOWER data struct that has the base case > loading/generation, while targetcasedata has that for the target > loading/generation. A continuation power flow traces power flow solutions > starting from the base case to the target case, if it can be reached. > > Please see the example on Page 46 of the manual > <http://www.pserc.cornell.edu/matpower/manual.pdf>. It has an > illustrative example demonstrating how to run a continuation power flow.. > > CPF can plot the PV curve by setting the cpf.plot.level MATPOWER option. > Additionally, you can choose specific bus(es) with the option cpf.plot.bus > (see Table 5.2 in the manual) > > MATPOWER does not directly transfer the continuation power flow results to > Excel, you can do so using the appropriate MATPOWER commands for exporting > data. The continuation power flow results are stored in the ouput results > struct of the continuation power flow. The description of the various > fields of this struct are given in Table 5.1. > > Hope this helps. > > Shri > > From: Mahbubur R <[email protected]> > Reply-To: MATPOWER discussion forum <[email protected]> > Date: Tuesday, February 21, 2017 at 4:50 PM > To: "[email protected]" <[email protected]> > Subject: CPF with Matpower > > Hello, > I apologize for a very basic question. I want to run CPF using matpower > and finding no way to do it. In the manual it says that I need to do the > following > > results = runcpf(basecasedata, targetcasedata) > > But, suppose I want to do CPF for the 14 bus - 'case14'. What do I need to > do for that? Is the case14 would be the basecasedata in this case? What > would be the targetcasedata? > > Once, these are solved can I transfer all P-V results to excel file in > order to draw the PV curve? > > Thanks in advance. > > > Bests- > Mahi > >
