Hello all, i want to run dc opf for 24 hr
i have the load scale for 24hr, and i want to multiply each load bus with this load scale to get the load for 24hr in MW how can i do that? i have attached: - case file -load scale -dcopf code
load scale.xlsx
Description: MS-Excel 2007 spreadsheet
OETC_DCOPF_2.m
Description: Binary data
OETC_OPF.m
Description: Binary data
