Currently MATPOWER does not provide a way to eliminate or modify the existing
power balance constraints. However, can you accomplish what you want with a set
of appropriately priced and constrained generators? Or with dispatchable loads?
Ray
> On Nov 22, 2018, at 9:37 AM, Sergio Garcia Marin <[email protected]>
> wrote:
>
> Dear all,
>
> I want to use the extended OPF formulation but i need to modify the power
> flow implicit constraints, or better, eliminate them to created my own ones
> i.e. I want to add non-supply demand as a varible with high cost, so i need
> to include this into the nodal power equations balance, if I add this
> constraints in the extended formulation, would this be in conflict with the
> implicitd nodal balance constraints included in matpower?
>
> Thanks in advance,
>
> Sergio G.M.
> UNAL-Mz
> <http://www.gipem.co/>