October 7, 2008 12:57 PM PDT

Army plans 500-megawatt solar thermal farm

By Elsa Wenzel
News.com

http://news.cnet.com/8301-11128_3-10060244-54.html?tag=newsEditorsPicksArea.0


The Army plans to install a 500-megawatt solar thermal power farm at a Fort 
Irwin, Calif., base as part of its bid to reduce a $3 billion annual energy 
bill, spent mostly on installations.

The Mojave Desert plant would feed electricity to the grid by 2014 for 
savings of $21 million and 4,015,000 tons of carbon dioxide over 25 years. 
Construction is set to begin in 2012.

The solar thermal system would eclipse today's largest U.S. solar thermal 
installation of 14 megawatts at Nellis Air Force Base near Las Vegas.

"By making greater use of alternative and renewable energy, Army 
initiatives will bring energy savings and security to the Army, reducing 
the risk of power disruption," said Keith Eastin, the Army's assistant 
secretary for Installations & Environment, who is charged with reporting 
the progress of energy projects to Army Secretary Pete Geren.

The solar project is close to the scale of the 550 megawatts planned to 
come online by 2013 by OptiSolar of Hayward, Calif., for what would be the 
world's largest thin-film photovoltaic plant. Utility Pacific Gas & 
Electric inked a deal with that company in August to use electricity from 
the target site in San Luis Obispo County.

The Army's Monday announcement came as it establishes an energy council to 
advance a collection of projects, including:

     * A joint geothermal initiative with the Navy to provide 30 megawatts 
at Hawthorne Army Depot, Nev., by 2012.
     * Biomass-to-fuel demonstrations at six Army posts: Forts Benning and 
Stewart in Georgia; Fort AP Hill, Va.; Fort Bragg, N.C.; Fort Drum, N.Y.; 
and Fort Lewis, Wash. A one-year test will begin in 2008. Waste for 
potential conversion for use as diesel or jet fuel would come from wood and 
grass clippings and cardboard.
     * Plans to buy 4,000 electric vehicles for maintenance and operations 
at Army posts, replacing 800 petroleum-powered vehicles. The Army aims to 
phase in the vehicles over three years, reducing the use of more than 11 
million gallons of fossil fuel.



=================================================
George Antunes                    Voice (713) 743-3923
Associate Professor               Fax   (713) 743-3927
Political Science                    Internet: antunes at uh dot edu
University of Houston
Houston, TX 77204-3011         

*******************************
* POST TO [EMAIL PROTECTED] *
*******************************

Medianews mailing list
[EMAIL PROTECTED]
http://lists.etskywarn.net/mailman/listinfo/medianews

Reply via email to