Min. & Max. gap validation for first installment is not done
------------------------------------------------------------
Key: MIFOS-4371
URL: http://mifosforge.jira.com/browse/MIFOS-4371
Project: mifos
Issue Type: Bug
Components: Loan Account
Environment: Master
Reporter: Deepak Paramasivam
Assignee: Tejus Datta
Priority: Major
For a variable installment loan, when the gap between disbursal date and due
date of first installment
1) is less than the specified minimum gap
2) is greater than the specified maximum gap
then, on click of Validate, a validation messages are not thrown.
1) Gap between disbursal date and due date of first installment is less than
the allowable minimum gap
2) Gap between disbursal date and due date of first installment is greater than
the allowable maximum gap
are the respective expected validation messages.
--
This message is automatically generated by JIRA.
-
If you think it was sent incorrectly contact one of the administrators:
http://mifosforge.jira.com/secure/Administrators.jspa
-
For more information on JIRA, see: http://www.atlassian.com/software/jira
------------------------------------------------------------------------------
Forrester recently released a report on the Return on Investment (ROI) of
Google Apps. They found a 300% ROI, 38%-56% cost savings, and break-even
within 7 months. Over 3 million businesses have gone Google with Google Apps:
an online email calendar, and document program that's accessible from your
browser. Read the Forrester report: http://p.sf.net/sfu/googleapps-sfnew
_______________________________________________
Mifos-issues mailing list
[email protected]
https://lists.sourceforge.net/lists/listinfo/mifos-issues