[
http://mifosforge.jira.com/browse/MIFOS-4371?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Kalyan Akella resolved MIFOS-4371.
----------------------------------
Resolution: Fixed
Fixed in head-master. Please verify in build 2508 or later.
> Min. & Max. gap validation for first installment is not done
> ------------------------------------------------------------
>
> Key: MIFOS-4371
> URL: http://mifosforge.jira.com/browse/MIFOS-4371
> Project: mifos
> Issue Type: Bug
> Components: Loan Account
> Affects Versions: Elsie F - Iteration 7
> Environment: Master
> Reporter: Deepak Paramasivam
> Assignee: Srikanth Nutigattu
> Priority: Major
> Fix For: Elsie F - Iteration 7
>
>
> For a variable installment loan, when the gap between disbursal date and due
> date of first installment
> 1) is less than the specified minimum gap
> 2) is greater than the specified maximum gap
> then, on click of Validate, a validation messages are not thrown.
> 1) Gap between disbursal date and due date of first installment is less than
> the allowable minimum gap
> 2) Gap between disbursal date and due date of first installment is greater
> than the allowable maximum gap
> are the respective expected validation messages.
--
This message is automatically generated by JIRA.
-
If you think it was sent incorrectly contact one of the administrators:
http://mifosforge.jira.com/secure/Administrators.jspa
-
For more information on JIRA, see: http://www.atlassian.com/software/jira
------------------------------------------------------------------------------
Learn how Oracle Real Application Clusters (RAC) One Node allows customers
to consolidate database storage, standardize their database environment, and,
should the need arise, upgrade to a full multi-node Oracle RAC database
without downtime or disruption
http://p.sf.net/sfu/oracle-sfdevnl
_______________________________________________
Mifos-issues mailing list
[email protected]
https://lists.sourceforge.net/lists/listinfo/mifos-issues