[
http://mifosforge.jira.com/browse/MIFOSBI-310?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=67768#comment-67768
]
johnwoodlock edited comment on MIFOSBI-310 at 6/8/11 5:54 PM:
--------------------------------------------------------------
Separate issue MIFOSADMIN-397 relates to deployed file versions problem.
Although of concern, it doesn't really explain the ETL communication errors.
Having difficulty getting test Rise ETL to fall over :(
was (Author: johnwoodlock):
Possibly Separate Issue
-----------------------
Hosted ETLs don't load in correct initial data and data definitions
(load_mifos_datawarehouse.sql) because the latest git version of
etl_prod_build.sh isn't being used to run hosted ETLs. Looks like someone must
have (on getting errors running an older version of etl_prod_build.sh) copied
the contents of load_mifos_datawarehouse_stored_procedures.sql into an older
version of load_mifos_datawarehouse.sql
The older version of the load_mifos_datawarehouse.sql had 2 entries in the
table stg_etl_run_history. These entries were wrongly left there in v1.1 but
didn't matter as nothing looked at them. V1.2 does look at that table (and
those entries are no longer there).
This explains why, when the ETL falls over, a date of '1900-01-01' rather than
ERROR can be seen on the dw reports parameter page.
Although of concern, it doesn't really explain the ETL communication errors.
Having difficulty getting test Rise ETL to fall over :(
> ETLs Failing when communicating with RDS Instances
> --------------------------------------------------
>
> Key: MIFOSBI-310
> URL: http://mifosforge.jira.com/browse/MIFOSBI-310
> Project: mifos business intelligence
> Issue Type: Bug
> Components: Data Warehouse
> Reporter: johnwoodlock
> Assignee: johnwoodlock
> Priority: Major
>
> All Prod and Test ETLs have failed intermittently with the following error
> which starts
> "Couldn't get row from result set
> Communications link failure due to underlying exception:
> ** BEGIN NESTED EXCEPTION **
> javax.net.ssl.SSLException
> MESSAGE: SSL peer shut down incorrectly"
> It has affected ETL BI versions 1.1 and 1.2 (didn't go back to check 1.0).
> Typically, it occurs in "Load DW Trxn Table" job. Has also occurred during
> the "Load stg_customer_and_account_updates For Accounts" Transformation.
>
--
This message is automatically generated by JIRA.
For more information on JIRA, see: http://www.atlassian.com/software/jira
------------------------------------------------------------------------------
EditLive Enterprise is the world's most technically advanced content
authoring tool. Experience the power of Track Changes, Inline Image
Editing and ensure content is compliant with Accessibility Checking.
http://p.sf.net/sfu/ephox-dev2dev
_______________________________________________
Mifos-issues mailing list
[email protected]
https://lists.sourceforge.net/lists/listinfo/mifos-issues