Hello, the synchronisation between evo and syncml (P800) worked with some problems with 0.80, but now upgrading to 0.81 it never completes a synchronization.
The sync starts ok, and then the p800 returns the error "connection failed", and stops with an error. Multisync remains in the "synchronising state" until it times out. (A cancel button would be a nice feature here). I have put the debug output for the last entry sent and then the point where the disconnection seems to happen: <Meta><Type xmlns="syncml:metinf"> text/x-vcalendar</Type></Meta><Item><Source><LocURI>5</LocURI></Source> <Data><![CDATA[BEGIN:VCALENDAR VERSION:1.0 BEGIN:VEVENT UID:[EMAIL PROTECTED] DTSTAMP:20031205T172219Z DTSTART:20031208T100000 DTEND:20031208T120000 TRANSP:OPAQUE SEQUENCE:2 SUMMARY:Schneider CLASS:PUBLIC LAST-MODIFIED:20031205T172232Z END:VEVENT END:VCALENDAR ]]></Data></Item></Replace></Sync><Final/></SyncBody></SyncML> 9! SyncML: We got some request data. SyncML: Disconnection, length 0. SyncML: SyncML disconnected. SyncML: Got disconnection, reasaon 2. SyncML: SyncML disconnected. SyncML: Got disconnection, reasaon 0. SyncML: SyncML server: Got error 1. SyncML: Resetting state. Got 5 changes. Change type: 1, object type: 1 Comp: BEGIN:VCALENDAR VERSION:2.0 BEGIN:VEVENT UID:57 SUMMARY:Telem DTSTART:20031216T100000 DTEND:20031216T180000 X-EPOCAGENDAENTRYTYPE:APPOINTMENT CLASS:PUBLIC DCREATED:20031213T000000Z LAST-MODIFIED:20031213T130300Z PRIORITY:0 STATUS:NEEDS ACTION END:VEVENT END:VCALENDAR I have the complete debug logs if you would like me to send them to you. Another error seems to come from the ToDo entries, see below: <Replace><CmdID>1</CmdID><Meta><Type xmlns="syncml:metinf">text/x-vcalendar</Type></Meta><Item><Target><LocURI>17</LocURI></Target><Source><LocURI>7</LocURI></Source><Data><![CDATA[BEGIN:VCALENDAR VERSION:1.0 BEGIN:VTODO UID:[EMAIL PROTECTED] SUMMARY:call decher training X-EPOCTODOLIST:To-do list STATUS:COMPLETED X-EPOCAGENDAENTRYTYPE:TODO CLASS:PUBLIC X-LIC-ERROR;X-LIC-ERRORTYPE=PROPERTY-PARSE-ERROR:Parse error in property name: DCREATED LAST-MODIFIED:20031210T151326Z CATEGORIES:X-65536 PRIORITY:1 DTSTAMP:20031124T214641Z COMPLETED:20031210T151326Z PERCENT-COMPLETE:100 SEQUENCE:1 END:VTODO END:VCALENDAR ]]></Data></Item></Replace> However when I removed these errors by deleting the ToDo entries, the disconnect problem still remained. Thanks for all the work that you putting into Multisync regards -- John Read NewNet Tel: +49-(0)8076-8879818 Fax: +49-(0)8076-8879819 ------------------------------------------------------- This SF.net email is sponsored by: IBM Linux Tutorials. Become an expert in LINUX or just sharpen your skills. Sign up for IBM's Free Linux Tutorials. Learn everything from the bash shell to sys admin. Click now! http://ads.osdn.com/?ad_id78&alloc_id371&op=click _______________________________________________ Multisync-users mailing list [EMAIL PROTECTED] https://lists.sourceforge.net/lists/listinfo/multisync-users
