Hi,
I take notes for some tasks, for example meetings, where obviously the
meeting is completed and I mark the task completed, but I want to keep
the task visable because the notes are valuable for some time in the
future.  Usually I want to hide tasks after I finish them, so what I
need is a way to overide the automatic hide for individual tasks.

Is this already possible?

If not, I would suggest the design be such that you are able to
independently take over control of hide parameter (such that it
ignores the autohide standard) for each task so that you can both hide
a task before the auto hide time, or not hide a task after the
autohide period.

Cheers,

Grant
--~--~---------~--~----~------------~-------~--~----~
You received this message because you are subscribed to the Google Groups 
"MyLifeOrganized" group.
To post to this group, send email to [email protected]
To unsubscribe from this group, send email to 
[email protected]
For more options, visit this group at 
http://groups.google.com/group/mylifeorganized?hl=en
-~----------~----~----~----~------~----~------~--~---

Reply via email to