Hi Dwight,

I have a someday context.  I have gone into the context (F8) and selected 
"HIDE IN TODO LIST", yet, when going to todo list it shows up...what am I 
doing wrong?

On Wednesday, 11 March 2015 00:24:46 UTC+2, Dwight Arthur wrote:
>
> Hi, John.
>
>  
>
> I’m going to assume that this is for Windows, ok?
>
>  
>
> Go to the all tasks view, zoom in to the Someday/Never folder, save the 
> current view as Someday, and assign it to a tab.
>
>  
>
> When you open an MLO session start by clicking the Someday tab then hit F3 
> to create a helper window showing the contents of the Someday folder. You 
> can minimize it if you like. Notice that “Someday” now shows up as a 
> separate item in your taskbar.
>
>  
>
> Back to the main window – switch to whatever other tab you want to use to 
> do your work. When you encounter a task that needs to go to “someday”, 
> click and drag the task(s) to the taskbar, and hover over the “someday” 
> item. The someday window will open. Continue dragging the task(s) to the 
> someday window and drop them there. If you had a someday context assigned 
> to the folder itself and you have the settings set correctly, the tasks 
> will inherit the someday context.
>
>  
>
> Done.
>
> -Dwight
>
>  
>
> *From:* [email protected] <javascript:> [mailto:
> [email protected] <javascript:>] *On Behalf Of *John Smith
> *Sent:* Tuesday, March 10, 2015 4:46 PM
> *To:* [email protected] <javascript:>
> *Subject:* [MLO] Having trouble putting tasks into "Someday/Never", if I 
> use Start Date a lot.
>
>  
>
> Hi 
>
>  
>
> I'm having trouble putting things into (and out of) Someday/Never.
>
>  
>
> Background
>
> I've made my "Someday/Never" file a folder, which for which I have ticked 
> "Hide Branch in To-Do". This means that it doesn't appear in my Active 
> tasks views - all good so far.
>
> I am also putting more an more stuff into the future using Start Date 
> (e.g. if someone hasnt got back to me in say 5 days, then give chase). This 
> works fine so long as I live mostly in the Active Tasks view, however if I 
> move to All Task view, then things become irritatingly cluttered up with 
> stuff I definitely don't want to see yet !  
>
>
> So the problem is that if I want to move a task into my Someday/Never 
> folder, the only way I even see this folder is to go to the "All Tasks" 
> view. But that view is now is horribly cluttered up with future stuff. And 
> because I am moving task up around with mostly with hotkeys (e.g. 
> Shift/Alt/arrow-key), all these things for the future a mighty pain.
>
>  
>
> Any suggestions?
>
>  
>
> J
>
>  
>
>  
>
> -- 
> You received this message because you are subscribed to the Google Groups 
> "MyLifeOrganized" group.
> To unsubscribe from this group and stop receiving emails from it, send an 
> email to [email protected] <javascript:>.
> To post to this group, send email to [email protected] 
> <javascript:>.
> Visit this group at http://groups.google.com/group/mylifeorganized.
> To view this discussion on the web visit 
> https://groups.google.com/d/msgid/mylifeorganized/9cc5e4e0-bd55-48a7-951c-2d28a2e4d9b0%40googlegroups.com
>  
> <https://groups.google.com/d/msgid/mylifeorganized/9cc5e4e0-bd55-48a7-951c-2d28a2e4d9b0%40googlegroups.com?utm_medium=email&utm_source=footer>
> .
> For more options, visit https://groups.google.com/d/optout.
>

-- 
You received this message because you are subscribed to the Google Groups 
"MyLifeOrganized" group.
To unsubscribe from this group and stop receiving emails from it, send an email 
to [email protected].
To post to this group, send email to [email protected].
Visit this group at http://groups.google.com/group/mylifeorganized.
To view this discussion on the web visit 
https://groups.google.com/d/msgid/mylifeorganized/1dafaf26-ce8a-41f3-a8c0-017facca302e%40googlegroups.com.
For more options, visit https://groups.google.com/d/optout.

Reply via email to