PS A partial answer my requirement #2 (above) seems to be to use Filter ==> General ==> "Show Next Actions", (which will show the next 1 action in each Project) and for anything which I want to manually flag up and force to appear, to make it into a sub-project (e.g. by using Alt/J). If possible would prefer to use actual MLO Flags because it would make reviewing slightly easier.
J On Monday, January 22, 2018 at 5:11:29 PM UTC, John . Smith wrote: > > > Hello > > 1. Is it possible to create a view (i.e. workarea) in MLO Windows that > always shows the *next 3 tasks* within a project, as well as showing any > Active stand-alone tasks? > > 2. If not, is it possible to create a view that always shows the next 1 > task within a project, plus any tags that have been manually flagged up in > some way, as well as any Active stand-alone tasks. > > From memory, I think the answer is that neither of these things can be > done in MLO, but I may have missed something(??). > > The background is that for my larger projects, I always want to show more > than one task at once on my to-do list. > > Many thanks > > J > > > > -- You received this message because you are subscribed to the Google Groups "MyLifeOrganized" group. To unsubscribe from this group and stop receiving emails from it, send an email to [email protected]. To post to this group, send email to [email protected]. Visit this group at https://groups.google.com/group/mylifeorganized. To view this discussion on the web visit https://groups.google.com/d/msgid/mylifeorganized/65431e50-9a30-40e6-9f16-3e25d540c625%40googlegroups.com. For more options, visit https://groups.google.com/d/optout.
