PS A partial answer my requirement #2 (above) seems to be to use Filter ==> 
General ==> "Show Next Actions", (which will show the next 1 action in each 
Project) and for anything which I want to manually flag up and force to 
appear, to make it into a sub-project (e.g. by using Alt/J).  If possible 
would prefer to use actual MLO Flags because it would make reviewing 
slightly easier.

J



On Monday, January 22, 2018 at 5:11:29 PM UTC, John . Smith wrote:
>
>
> Hello 
>
> 1. Is it possible to create a view (i.e. workarea) in MLO Windows that 
> always shows the *next 3 tasks* within a project, as well as showing any 
> Active stand-alone tasks?
>
> 2. If not, is it possible to create a view that always shows the next 1 
> task within a project, plus any tags that have been manually flagged up in 
> some way, as well as any Active stand-alone tasks.
>
> From memory, I think the answer is that neither of these things can be 
> done in MLO, but I may have missed something(??).
>
> The background is that for my larger projects, I always want to show more 
> than one task at once on my to-do list.
>
> Many thanks
>
> J
>
>
>
>

-- 
You received this message because you are subscribed to the Google Groups 
"MyLifeOrganized" group.
To unsubscribe from this group and stop receiving emails from it, send an email 
to [email protected].
To post to this group, send email to [email protected].
Visit this group at https://groups.google.com/group/mylifeorganized.
To view this discussion on the web visit 
https://groups.google.com/d/msgid/mylifeorganized/65431e50-9a30-40e6-9f16-3e25d540c625%40googlegroups.com.
For more options, visit https://groups.google.com/d/optout.

Reply via email to