Thank you Dwight. 
So although I find it rather confusing, it is roughly as I 
remembered, then. 

But what is bemusing though is that from what I can see "Next Actions" is 
treating anything flagged up as being a Folder in the same way as if it 
were a Project.  i.e. Only one child per FOLDER is ever visible. 

If so this seems to be an undocumented (and in my view unwelcome) feature. 

The User Guide 
(https://www.mylifeorganized.net/downloads/files/MyLifeOrganized%20User%27s%20Guide.pdf)
 
reads as follows:


Page 47 Section 5.3.2

>>>
1. Active
If Active is selected as the Action Filter then only Active tasks are 
placed in the list first and then other
filters can be used to select tasks from this list. To be placed on the 
list of Active actions, a task must
meet all criteria listed below:
1) the task must not have subtasks or these subtasks should be completed
2) the task must not have completed parent tasks
3) the Start Date for the task is not set or Start Date is now or in the 
past
4) the task must not have the option Folder checked
5) the task must not have the option Hide branch in To-Do List checked for 
this task as well as for any of
its parents
6) If one of the task's parents has the option Complete subtasks in order 
checked, this task must have
all above siblings completed to be placed in the list. Or these siblings 
can have Hide in To-Do option
set.
7) If the task has dependency tasks these dependency tasks must have been 
completed.
>>>


>>>
3. Next Actions
If Next Actions is selected as the Action Filter then only Next Actions are 
placed in the list first and then
other filters can be used to select tasks from this list. To be placed on 
the list of Next Actions a task
should meet all the criteria listed for Active Actions. However only one 
(first) active task for each project
is placed in the list.
Note: If there are Active Tasks without parent project then only first task 
for each root task
is selected.
Note: If a project does not have open tasks then this project itself is 
also placed on the list
as Next Action.
>>>

Or am I missing something?

J










On Monday, January 22, 2018 at 6:20:55 PM UTC, Dwight wrote:
>
> John, the last time you and I went through this, the result was that the 
> Next Actions filter is available only as the global Action Filter and 
> not as an advanced filter - the result of this is that if you have a 
> view where any of the included items are there because of being a next 
> action then *every* item included in the view must be a direct action. 
>
> Long term solution: request an advanced filter for "Next Action". I 
> believe that you have requested this. To the best of my knowledge there 
> has been no movement towards implementing it. If you would like to 
> influence this, the best method would be to become an active member of 
> the beta test team and advocate for it there. 
>
> Short term solution: as you noted, if a task needs to be included 
> despite being not a next-action, make the task to be the only item in a 
> subproject, by definition it will be a next-action. 
>
> To answer your other question, A next actions view will include a task 
> from a folder if it meets the definition of a next action. If there are 
> no issues with start dates, dependencies, etc that should mean that the 
> first task in the first subfolder is included. There are some parts of 
> this that get intricate and I do not remember all of the rules, you 
> should experiment. 
>
> -Dwight 
>
> On 1/22/2018 12:33 PM, John . Smith wrote: 
> > PPS 
> > Ah, now I remember. I am correct in thinking that the "Next Actions" 
> > view doesn't any standalone actions (if they are inside a Folder) ?? 
> > 
> > J 
> > 
> > 
> > 
> > On Monday, January 22, 2018 at 5:19:16 PM UTC, John . Smith wrote: 
> > 
> > 
> >     PS A partial answer my requirement #2 (above) seems to be to use 
> >     Filter ==> General ==> "Show Next Actions", (which will show the 
> >     next 1 action in each Project) and for anything which I want to 
> >     manually flag up and force to appear, to make it into a sub-project 
> >     (e.g. by using Alt/J).  If possible would prefer to use actual MLO 
> >     Flags because it would make reviewing slightly easier. 
> > 
> >     J 
> > 
> > 
> > 
> >     On Monday, January 22, 2018 at 5:11:29 PM UTC, John . Smith wrote: 
> > 
> > 
> >         Hello 
> > 
> >         1. Is it possible to create a view (i.e. workarea) in MLO 
> >         Windows that always shows the *next 3 tasks* within a project, 
> >         as well as showing any Active stand-alone tasks? 
> > 
> >         2. If not, is it possible to create a view that always shows the 
> >         next 1 task within a project, plus any tags that have been 
> >         manually flagged up in some way, as well as any Active 
> >         stand-alone tasks. 
> > 
> >          From memory, I think the answer is that neither of these things 
> >         can be done in MLO, but I may have missed something(??). 
> > 
> >         The background is that for my larger projects, I always want to 
> >         show more than one task at once on my to-do list. 
> > 
> >         Many thanks 
> > 
> >         J 
> > 
> > 
> > 
> > -- 
> > You received this message because you are subscribed to the Google 
> > Groups "MyLifeOrganized" group. 
> > To unsubscribe from this group and stop receiving emails from it, send 
> > an email to [email protected] <javascript:> 
> > <mailto:[email protected] <javascript:>>. 
> > To post to this group, send email to [email protected] 
> <javascript:> 
> > <mailto:[email protected] <javascript:>>. 
> > Visit this group at https://groups.google.com/group/mylifeorganized. 
> > To view this discussion on the web visit 
> > 
> https://groups.google.com/d/msgid/mylifeorganized/f6e2f499-ec04-4b99-bce7-d8ea84d4ad4a%40googlegroups.com
>  
> > <
> https://groups.google.com/d/msgid/mylifeorganized/f6e2f499-ec04-4b99-bce7-d8ea84d4ad4a%40googlegroups.com?utm_medium=email&utm_source=footer>.
>  
>
> > For more options, visit https://groups.google.com/d/optout. 
>

-- 
You received this message because you are subscribed to the Google Groups 
"MyLifeOrganized" group.
To unsubscribe from this group and stop receiving emails from it, send an email 
to [email protected].
To post to this group, send email to [email protected].
Visit this group at https://groups.google.com/group/mylifeorganized.
To view this discussion on the web visit 
https://groups.google.com/d/msgid/mylifeorganized/61edda3f-a7c7-4cfc-9e08-53d0f3c4ea43%40googlegroups.com.
For more options, visit https://groups.google.com/d/optout.

Reply via email to