I agree. Thanks very much Don for doing this! I got mine yesterday. Sent from my iPhone
> On Dec 11, 2014, at 9:39 AM, Crusty OMO <[email protected]> wrote: > > Group, we need a big HIP-HIP HURRAY for Don! > > I know mailing the right orders out to 24 people is a lot of work. > That's finding the order, filling/counting it & recounting, packaging and > boxing, finding the address, labeling, checking the address, going over > everything though your mind one last time, then mailing. > > My order came together with Matt's (we are practically neighbors, relative to > the size of Earth) and it took us a good 15 minutes to sort divide the > package evenly, there was even 1 mistake that was caught on the recount! > > Don, Thank you again!, and all the best to you and yours over the upcoming > Holidays! > > Regards, > Josh Bensadon > > > > Date: Thu, 11 Dec 2014 01:20:13 -0800 > From: [email protected] > To: [email protected] > Subject: [N8VEM-S100:5825] FP Mini Group NKK Switch Group - Complete > > > Attention FP Mini builders > > All switch orders have been shipped today. I apologize for the > delay in shipping. Year end crunch at the office and labor > involved in putting these shipments together got the best of me. > > I had nearly 1000 switches to sort through, count, recount, and > package. I did my best to get orders correct. If you find extra > switches or are missing some please let me know. I have a nagging > fear a couple could have got mixed up. Joe got Sam's order and > vis-versa. > > If you've been watching the Wiki, I do regret that the RUN and HALT > LED's got swapped. You have two choices here. Change the silkscreen, > or wait for a fix. I attempted some jump and cut and borked my > board. Luckly I was able to restore and got it operational again. I do have > a fix that does not require cuts and jumpers. It's a bit cheesy so I'm > reluctant to share at this point. Basicaly involves placing tape over the > component holes and using the long LED leads to reach the proper holes. > > I am planning on a V2 board. It will have the LED fix, all jumpers moved > to a dip switch on top of the board and line drivers for the S100 bus signals > which should allow the board to run better at higher speeds. It's going to be > tricky finding real estate for the extra components, but I'm up for the > challenge. > > Thank you all for supporting this project. > > Here is a list of folks who were shipped switches. If you ordered some and > your name is not on the list please contact me. > > > Josh Bensadon > Richard Cini > Fabio Battaglia > John Monahan > Leonard Young > Pete Plank > Leon Byles > Robert Greenstreet > Nik Brisevac > Jack Rubin > Edward Snider > James Cobb > Andrew Kwan > Neil Breeden > Matt Turner > Malcolm Macleod > Kenneth Robbins > Andrew Bingham > Richard Bromagem > Todd Goodman > Paul Birkel > Gary Kaufman > Gregory Beat > Ian McLaughlin > > -- > Don Caprio > [email protected] > > -- > You received this message because you are subscribed to the Google Groups > "N8VEM-S100" group. > To unsubscribe from this group and stop receiving emails from it, send an > email to [email protected]. > For more options, visit https://groups.google.com/d/optout. > -- > You received this message because you are subscribed to the Google Groups > "N8VEM-S100" group. > To unsubscribe from this group and stop receiving emails from it, send an > email to [email protected]. > For more options, visit https://groups.google.com/d/optout. -- You received this message because you are subscribed to the Google Groups "N8VEM-S100" group. To unsubscribe from this group and stop receiving emails from it, send an email to [email protected]. For more options, visit https://groups.google.com/d/optout.
