Hi,

Let me explain a bit better:

For example, the composite table tests do not run correctly [1].  It is not
that they fail but for some reason tycho is not happy. Depending on who is
responsible for the composite table tests, this could take some time.
Perhaps some days, perhaps some weeks.

All that time, other widget changes cannot release because the build
breaks.

If we have one build job per widget then the "release job" would always
just consume the latest successful build for any widget.

Best regards,

Wim

[1]
https://hudson.eclipse.org/hudson/job/maven-nebula-1.0-nightly/158/console


On Sat, Nov 19, 2011 at 1:52 AM, Tom Schindl <[email protected]>wrote:

> Hi Wim,
>
> Am 19.11.11 01:31, schrieb Wim Jongman:
> > I think we need to create a build job per widget. If one widget fails
> > for some reason, the complete build is invalid.
>
> Well the one that breaks the build is responsible for fixing. I really
> don't think that it is pratical to have a build job for each widget.
>
> Tom
>
> --
> B e s t S o l u t i o n . a t                        EDV Systemhaus GmbH
> ------------------------------------------------------------------------
> tom schindl                 geschäftsführer/CEO
> ------------------------------------------------------------------------
> eduard-bodem-gasse 5-7/1   A-6020 innsbruck     fax      ++43 512 935833
> http://www.BestSolution.at                      phone    ++43 512 935834
> _______________________________________________
> nebula-dev mailing list
> [email protected]
> https://dev.eclipse.org/mailman/listinfo/nebula-dev
>
_______________________________________________
nebula-dev mailing list
[email protected]
https://dev.eclipse.org/mailman/listinfo/nebula-dev

Reply via email to