Hi Nicolas, Allright this makes sense. I missed the history.
The oscilloscope tests are running now. I switched it to another junit version. Regards Wim Sent from my iPhone On 19 nov. 2011, at 22:21, Nicolas Richeton <[email protected]> wrote: > Hi Wim, Tom, > > There are several reasons why we have only 2 builds : > > * When we were building using cron jobs and athena, we had 1 job per widget. > As Tom said, it was introducing a lot of overhead when updating the build > process or adding a new widget. > * With Hudson, we cannot manage jobs directly : creating a new job requires > an action from the webmaster. (However, this does to take long) > * Eclipse webmasters do not like having 15 builds for a single project. This > creates a lot of unnecessary load on serveurs. > * As discussed in this list, we are trying to do a stable release of Nebula. > This implies releasing several widgets at once. Since we won't be doing > separate release, a failing build should be an issue for all committers, not > only for the one responsible of this widget. (This is true mostly for the > stable build). > > In my opinion, it would be a great if at some point, each committer has > enough knowledge to work on any Nebula widget. This would increase overall > quality and speed up development and bug fixes. > I think that using only 2 builds will help us to reach that point, since we > cannot ignore a broken widget and everyone will be somehow responsible to do > the fix (thus work on every widget). > >> BTW can't one >> configure tycho to proceed even if the tests are failing? > > I think this is generally a bad idea as this would mean that failing tests > are a minor issue and they are not. :-) > > I'll try to look at failing and remaining tests next week (composite table, > oscilloscope, and xviewer). Can I update tests which cause issues (based on > gallery ones) ? > > I also requested the reactivation of my shell account so I can look at the > download area (just received a mail because we are using 9Gb and quota is 2Gb > max) > > -- > Nicolas > > Le 19 nov. 2011 à 02:28, Tom Schindl a écrit : > >> Hi, >> >> Then they have to comment out their tests until they can be run >> successful - this how it is done also in other projects. BTW can't one >> configure tycho to proceed even if the tests are failing? >> >> Tom >> >> Am 19.11.11 02:22, schrieb Wim Jongman: >>> Hi, >>> >>> Let me explain a bit better: >>> >>> For example, the composite table tests do not run correctly [1]. It is >>> not that they fail but for some reason tycho is not happy. Depending on >>> who is responsible for the composite table tests, this could take some >>> time. Perhaps some days, perhaps some weeks. >>> >>> All that time, other widget changes cannot release because the build >>> breaks. >>> >>> If we have one build job per widget then the "release job" would always >>> just consume the latest successful build for any widget. >>> >>> Best regards, >>> >>> Wim >>> >>> [1] >>> https://hudson.eclipse.org/hudson/job/maven-nebula-1.0-nightly/158/console >>> >>> >>> On Sat, Nov 19, 2011 at 1:52 AM, Tom Schindl >>> <[email protected] <mailto:[email protected]>> wrote: >>> >>> Hi Wim, >>> >>> Am 19.11.11 01:31, schrieb Wim Jongman: >>>> I think we need to create a build job per widget. If one widget fails >>>> for some reason, the complete build is invalid. >>> >>> Well the one that breaks the build is responsible for fixing. I really >>> don't think that it is pratical to have a build job for each widget. >>> >>> Tom >>> >>> -- >>> B e s t S o l u t i o n . a t EDV Systemhaus GmbH >>> ------------------------------------------------------------------------ >>> tom schindl geschäftsführer/CEO >>> ------------------------------------------------------------------------ >>> eduard-bodem-gasse 5-7/1 A-6020 innsbruck fax ++43 512 >>> 935833 <tel:%2B%2B43%20512%20935833> >>> http://www.BestSolution.at phone ++43 512 >>> 935834 <tel:%2B%2B43%20512%20935834> >>> _______________________________________________ >>> nebula-dev mailing list >>> [email protected] <mailto:[email protected]> >>> https://dev.eclipse.org/mailman/listinfo/nebula-dev >>> >>> >>> >>> >>> _______________________________________________ >>> nebula-dev mailing list >>> [email protected] >>> https://dev.eclipse.org/mailman/listinfo/nebula-dev >> >> >> -- >> B e s t S o l u t i o n . a t EDV Systemhaus GmbH >> ------------------------------------------------------------------------ >> tom schindl geschäftsführer/CEO >> ------------------------------------------------------------------------ >> eduard-bodem-gasse 5-7/1 A-6020 innsbruck fax ++43 512 935833 >> http://www.BestSolution.at phone ++43 512 935834 >> _______________________________________________ >> nebula-dev mailing list >> [email protected] >> https://dev.eclipse.org/mailman/listinfo/nebula-dev > > _______________________________________________ > nebula-dev mailing list > [email protected] > https://dev.eclipse.org/mailman/listinfo/nebula-dev _______________________________________________ nebula-dev mailing list [email protected] https://dev.eclipse.org/mailman/listinfo/nebula-dev