Hi there, I've noticed since I started using 1.9.5 and continuing with 2.0, shutting down the database takes a very long time. Looking at the messages.log file shows that the delay seems to occur between the "Database is now unavailable" and the "GC Monitor stopped" messages, with a delay of exactly 20 seconds. I'm using it embedded. I don't see any settings in the kernel configuration with a setting of 20s. Is this a known issue or expected behavior?
-- You received this message because you are subscribed to the Google Groups "Neo4j" group. To unsubscribe from this group and stop receiving emails from it, send an email to [email protected]. For more options, visit https://groups.google.com/groups/opt_out.
