Hi there,

I've noticed since I started using 1.9.5 and continuing with 2.0, shutting 
down the database takes a very long time. Looking at the messages.log file 
shows that the delay seems to occur between the "Database is now 
unavailable" and the "GC Monitor stopped" messages, with a delay of exactly 
20 seconds. I'm using it embedded. I don't see any settings in the kernel 
configuration with a setting of 20s. Is this a known issue or expected 
behavior?

-- 
You received this message because you are subscribed to the Google Groups 
"Neo4j" group.
To unsubscribe from this group and stop receiving emails from it, send an email 
to [email protected].
For more options, visit https://groups.google.com/groups/opt_out.

Reply via email to