It automatically starts transactions.

Try to do g.commit() before you shut down.

Michael

Am 18.01.2014 um 03:18 schrieb Jack Jones <[email protected]>:

> Hmm, I'm actually not reading or writing anything, just starting up and 
> shutting down. I am using it with TinkerPop Blueprints 2.5 though, I wonder 
> if that's doing something with a transaction. Let me look into that a bit.
> 
> On Friday, January 17, 2014 8:33:18 PM UTC-5, Michael Hunger wrote:
> Jack,
> 
> you have still open/dangling transactions, if you close them correctly it 
> will shut down instantly.
> 
> Michael
> 
> Am 18.01.2014 um 01:55 schrieb Jack Jones <[email protected]>:
> 
>> Hi there,
>> 
>> I've noticed since I started using 1.9.5 and continuing with 2.0, shutting 
>> down the database takes a very long time. Looking at the messages.log file 
>> shows that the delay seems to occur between the "Database is now 
>> unavailable" and the "GC Monitor stopped" messages, with a delay of exactly 
>> 20 seconds. I'm using it embedded. I don't see any settings in the kernel 
>> configuration with a setting of 20s. Is this a known issue or expected 
>> behavior?
>> 
>> -- 
>> You received this message because you are subscribed to the Google Groups 
>> "Neo4j" group.
>> To unsubscribe from this group and stop receiving emails from it, send an 
>> email to [email protected].
>> For more options, visit https://groups.google.com/groups/opt_out.
> 
> 
> -- 
> You received this message because you are subscribed to the Google Groups 
> "Neo4j" group.
> To unsubscribe from this group and stop receiving emails from it, send an 
> email to [email protected].
> For more options, visit https://groups.google.com/groups/opt_out.

-- 
You received this message because you are subscribed to the Google Groups 
"Neo4j" group.
To unsubscribe from this group and stop receiving emails from it, send an email 
to [email protected].
For more options, visit https://groups.google.com/groups/opt_out.

Reply via email to