There is a vast difference between reducing your manufacturing costs
and "Muntzing".

I've not used the term "muntzing" in many years. The last time I did
was when a marketing fleeb sat in on an engineering meeting with the
belief our EE/ME staff were taking too long on a complex project that
was running over budget. I stated that we needed his muntzing skills
to whittle down the cost and still have it work...;)  He understood it
as a warm compliment.

As Nick described, it was a hack method to eliminate components to the
minimum and still maintain some level of function.
It may have cut fabrication costs by a small degree, but was also
synonymous with being cheap and poorly engineered.
Nothing a self respecting engineer would want to hang his hat on.

And like Terry says;
A Professional Engineer may spend as much time designing the product
to minimize cost, as they do in designing it's function.


Regards, Jeff

-- 
You received this message because you are subscribed to the Google Groups 
"neonixie-l" group.
To post to this group, send an email to [email protected].
To unsubscribe from this group, send email to 
[email protected].
For more options, visit this group at 
http://groups.google.com/group/neonixie-l?hl=en-GB.

Reply via email to