James Ewen wrote: > 2009/10/4 Iván Sánchez Ortega > <[email protected]>: > > > Oh, you call that overkill? > > What about this? > > http://www.openstreetmap.org/?lat=53.4360945224762&lon=-113.4887266159 > 06&zoom=15 > > You can't see all of them in the OSM map, but there are 27 bridges in > this intersection, when it could have been done with 2. NB traffic on > highway 2 has to move to the high speed lanes on the left side of the > motorway to take the exit ramp, which then uses a fly-over bridge to > get the traffic back to the right hand side of the roadway where it > should have been for a proper exit ramp. After the fly over, you have > to make 5 separate lane changes to the left in order to get onto the > EB through lanes, as the right hand lane keeps ending as new lanes are > added on the left. > > Traffic entering the SB motorway merges into existing traffic from the > left, rather than the right... here through traffic has to merge left > into entering traffic across 4 lanes to get out of lanes that are > ending. There is not a single lane that you can travel in SB through > this intersection from start to finish. You have to make lane changes > to be able to get through it, and the SB roadway is 3 lanes wide. > > Some days you just want to take the traffic planners out and shoot > them! > > James > VE6SRV
Did you miss a link, or is it not yet built? Easbound to Northbound. Sat. shows construction there. -- Randy (aka K5MW) It's all your fault! _______________________________________________ newbies mailing list [email protected] http://lists.openstreetmap.org/listinfo/newbies

