Yashwant Dhakad created OFBIZ-13246:
---------------------------------------

             Summary: Automate creation of production runs from approved 
internal requirements in the Manufacturing module
                 Key: OFBIZ-13246
                 URL: https://issues.apache.org/jira/browse/OFBIZ-13246
             Project: OFBiz
          Issue Type: Improvement
          Components: manufacturing
    Affects Versions: Upcoming Branch
            Reporter: Yashwant Dhakad


In the Manufacturing module, when an internal requirement is approved, the 
system doesn’t automatically create the related production run. Instead, users 
have to manually go back to the manufacturing screen and enter details like the 
product ID, facility, and quantity again. This is because the requirement 
approval screen neither shows the production run nor starts it.

This creates a disconnect between two steps that are closely related: the 
component that has been made internally and the finished product that needs to 
be produced. This gap leads to delays, mistakes, and inefficiencies—especially 
in high-volume operations. To fix this, the system should:
 * Automatically create a production run upon requirement approval, applying 
the associated Bill of Materials (BOM) and routing.
 * Link the production run to the requirement for traceability.
 * Display a UI message or log to confirm creation.

These changes will eliminate redundant steps, enhance traceability, and 
streamline manufacturing operations.



--
This message was sent by Atlassian Jira
(v8.20.10#820010)

Reply via email to