On Mon, 2007-05-07 at 18:07 +0200, Tom Laermans wrote:
> # upsc [EMAIL PROTECTED]|grep load
> ups.load: 0.0
> 
> This UPS has 2 pc's and some minor other gear connected, yet the load
> stays at 0.0 when checking with nut.

Ahem - apparently the load was connected to the passthrough connectors
instead of the actual battery-backed ones. Load now reads out fine. Doh.

-- 
Tom Laermans
System Administrator

Luciad NV - http://www.luciad.com
Gaston Geenslaan 9, 3001 Leuven, Belgium




_______________________________________________
Nut-upsuser mailing list
[email protected]
http://lists.alioth.debian.org/mailman/listinfo/nut-upsuser

Reply via email to