On Mon, 2007-05-07 at 18:07 +0200, Tom Laermans wrote: > # upsc [EMAIL PROTECTED]|grep load > ups.load: 0.0 > > This UPS has 2 pc's and some minor other gear connected, yet the load > stays at 0.0 when checking with nut.
Ahem - apparently the load was connected to the passthrough connectors instead of the actual battery-backed ones. Load now reads out fine. Doh. -- Tom Laermans System Administrator Luciad NV - http://www.luciad.com Gaston Geenslaan 9, 3001 Leuven, Belgium _______________________________________________ Nut-upsuser mailing list [email protected] http://lists.alioth.debian.org/mailman/listinfo/nut-upsuser

