Hey all,

I have a triplite 1050 and when I did a test today I saw that the battery bounce from 100 to 80 to 90 to 91 percent before UPSD lost its connection to the UPS. The server then decided that it was time to shut off.

The UPS sat at 91% for about 5 min before UPSD lost its connection, so I'm not sure if it wasn't updating its battery.charge... I wasn't sure if this is expected behavior...

Luckily this was a planned test and my script just outputs to messages that it believes it is time to shut off.


upsc ups
battery.charge:  91
battery.test.status: Battery OK
battery.voltage: 13.00
battery.voltage.nominal: 18
driver.name: tripplite_usb
driver.parameter.pollinterval: 2
driver.parameter.port: auto
driver.version: 2.2.2
driver.version.internal: 0.11.1
input.voltage: 0.00
input.voltage.nominal: 120
output.voltage: 118.0
ups.debug.load_banks: 0
ups.debug.V: 31 30 33 30 58 58 0d '1030XX.'
ups.delay.shutdown: 64
ups.firmware: F0957.B
ups.firmware.aux: protocol 2001
ups.mfr: Tripp Lite
ups.model: OMNISMART1050
ups.power.nominal: 1050
ups.status: OB


Sep 25 15:34:43 server kernel: hiddev96: USB HID v1.00 Device [TRIPP LITE TRIPP LITE OMNISMART1050 ] on usb-0000:00:1f.2-2

Broadcast message from nut (Tue Sep 25 15:34:44 2012):

Communications with UPS [email protected] lost
Sep 25 15:34:44 server upsmon[18224]: Poll UPS [[email protected]] failed - Driver not connected Sep 25 15:34:44 server upsmon[18224]: Communications with UPS [email protected] lost Sep 25 15:34:44 server wall[3925]: wall: user nut broadcasted 1 lines (44 chars) Sep 25 15:34:49 server upsmon[18224]: Poll UPS [[email protected]] failed - Driver not connected

Broadcast message from nut (Tue Sep 25 15:34:59 2012):

Executing automatic power-fail shutdown

_______________________________________________
Nut-upsuser mailing list
[email protected]
http://lists.alioth.debian.org/cgi-bin/mailman/listinfo/nut-upsuser

Reply via email to