Hi,

On Wed, Apr 28, 2010 at 10:46 AM, Dick Vlaanderen <[email protected]> wrote:
> Hi Jochen
> I have not done a theatre booking system. I have done a job scheduling
> system using Flex as the front end and PHP as the back-end. To schedule a
> job, you must assign 4 types of resources:
>
> date/time slot when the job is to be executed,
> a driver
> one or more vehicles
> one or more implements.
>
> The resources are displayed in a table and are colour coded as they are
> assigned to a job. Resources are greyed out if they are used in the same
> time slot.
> You could do a similar thing for the theatre booking system.
> Dick Vlaanderen
> ZCE

refer to Craig Cochrane, he was looking for one.

Kind Regards,

Jochen

-- 
NZ PHP Users Group: http://groups.google.com/group/nzphpug
To post, send email to [email protected]
To unsubscribe, send email to
[email protected]

Reply via email to