Francesco Mari created OAK-3461:
-----------------------------------

             Summary: Run m-bundle-p:baseline before integration tests
                 Key: OAK-3461
                 URL: https://issues.apache.org/jira/browse/OAK-3461
             Project: Jackrabbit Oak
          Issue Type: Improvement
          Components: parent
            Reporter: Francesco Mari
            Assignee: Francesco Mari


The baseline goal of the maven-bundle-plugin is currently bound to the verify 
phase (as per default). It should be bound to the pre-integration-test phase to 
give it a possibility to fail before integration tests are executed.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)

Reply via email to