Thanks for the numerous defect fixes that have come in.
I think we are ready to move to the phase of validating the
quality of the trunk with lots of test suites.

Prasad from AMD sent email on Feb 25 listing a number of test
suites he is planning to validate with. I think now is a good time
to do those runs and let us know the results. Others should also
go through their release testing. I would like to propose March 20
as the date to finish running the test suites and reporting results.
Thanks.

- Suneel

On Thu, Feb 24, 2011 at 8:57 AM, Suneel Jain <suneel.j...@gmail.com> wrote:
> Update on the 4.2.4 release planned for end of March 2011:
>
>  - We entered stage 2 (bug fixes only) on Feb 1. There have been
>   a lot of defects fixed since then. I would like to thank everyone
>   who has checked in defect fixes so far and helped close out many
>   defects. If there are specific defects that are still open and you view
>   them as critical, please let me know I can try to ensure they get
>   addressed before we release 4.2.4 .
>  - The stage 2 (defect fixes) is currently planned to end on March 20.
>   Since the defect fixes are going very well, I would like to pull that
>   up to March 10 and finish defect fixing for the release by then.
>  - I would like to request help with running of the various test suites.
>   Please send email about which test suites you are running and
>   the results you are seeing with the current trunk sources.
>
> Regards,
>
> - Suneel
>
>
> On Fri, Jan 7, 2011 at 11:30 AM, Suneel Jain <suneel.j...@gmail.com> wrote:
>> In my role as the release manager for the next Open64 compiler release,
>> I would like to communicate the current plan. This was discussed and
>> approved in the last meeting of the Open64 Steering Group. There has
>> been significant new functionality, performance improvements, defect
>> fixes and infrastructure improvements since the 4.2.3 release,  The
>> next release will follow the planned cycle of annual updates.
>>
>> The plan is to stop active development on trunk by Jan 31, 2011.
>> All new functionality and enhancements for the 4.2.4 release need
>> to be checked in by this date. If this date does not work for you,
>> please let me know and we can make adjustments to this date.
>>
>> The bug fix (stage 2) for the release is planned for Feb 1 - Mar 20.
>> This period is for going through the release testing and fixing of
>> defects uncovered in the process or to fix open defects from the
>> Bugzilla database. On March 20, we would create a branch
>> for the 4.2.4 release and open the trunk for active development
>> for the next release. After a final round of testing, the plan is
>> to post the 4.2.4 release bits by March 31, 2011.
>>
>> I would like to request anyone who has made checkins since
>> March 15, 2010 to consider updating the "changes in 4.2.4"
>> document, which is under the Open64 Wiki:
>>
>>  http://wiki.open64.net/index.php/ActiveDevelopment
>>
>> If you can volunteer for test builds, running test suites or
>> doing performance measurements on different platforms
>> during the the Feb-March stage 2 time, please let me know.
>>
>> - Suneel
>>
>

------------------------------------------------------------------------------
Colocation vs. Managed Hosting
A question and answer guide to determining the best fit
for your organization - today and in the future.
http://p.sf.net/sfu/internap-sfd2d
_______________________________________________
Open64-devel mailing list
Open64-devel@lists.sourceforge.net
https://lists.sourceforge.net/lists/listinfo/open64-devel

Reply via email to