Morning Folks, I have a OpenBD Scheduled Task mystery I cant solve and I'm hoping someone can point me in the right direction. Before I get into the issue, here are the specs on what I'm running:
OpenBD Version: 1.4 OS: Linux amd64 (2.6.18-194.26.1.el5) Application Server: Apache Tomcat/7.0.4 JVM: 1.6.0_22 The task is scheduled to run every 4 hours from 6:00 am to 7:00 pm. The task is designed to send me an email upon completion. Well lately I've been getting 4 status emails and could not figure out why. I decided to take a look at the scheduled task log and noticed the task is running 4 times on each run. Have any of you seen anything like this while using a scheduled task w/OpenBD 1.4? I have not seen this on any other version of OpenBD so I thought I'd check with the group. -- Open BlueDragon Public Mailing List http://www.openbluedragon.org/ http://twitter.com/OpenBlueDragon official manual: http://www.openbluedragon.org/manual/ Ready2Run CFML http://www.openbluedragon.org/openbdjam/ mailing list - http://groups.google.com/group/openbd?hl=en
