Hi,
While looking at ways to reduce the number of jobs we run in the Neutron
gate, I found we ran two very similar jobs for some projects:
gate-grenade-dsvm-neutron-ubuntu-xenial (single-node job)
gate-grenade-dsvm-neutron-multinode-ubuntu-xenial (2-node job)
We talked about this in the Neutron CI meeting this week [1] and felt it
best to remove the single-node job and just run the multi-node job,
mostly because it more mimics a "real" Neutron deployment where there
are separate controller and compute nodes. Looking at the Neutron
grafana dashboard [2] the two jobs have about the same failure rate in
the gate (~0), so I don't think there will be any problems with the switch.
This has an impact on the integrated gate since it currently runs the
single-node job, so I wanted ot get thoughts on any issues they'd have
with this change [3].
Thanks,
-Brian
[1]
http://eavesdrop.openstack.org/meetings/neutron_ci/2017/neutron_ci.2017-07-11-16.00.log.html#l-112
[3] http://grafana.openstack.org/dashboard/db/neutron-failure-rate
[2] https://review.openstack.org/#/c/483600/
__________________________________________________________________________
OpenStack Development Mailing List (not for usage questions)
Unsubscribe: openstack-dev-requ...@lists.openstack.org?subject:unsubscribe
http://lists.openstack.org/cgi-bin/mailman/listinfo/openstack-dev