On 20-10-11 07:08, Martin Trautmann wrote: > I now checked with google street view - and there are several mistakes. > 1) the offical autoroute does not go through. Instead, it does end at > about 100 m before the crossing > 2) the exit has a give-way sign at the crossing. > > The announcement of the crossing has an announcement, naming 150 m > before. What's the distance of the posts? Are they 25 instead of 50 m? > 3) autoroute then starts about 50 m after the crossing. > > It's the same situation on both the north side exit with a T crossing > and the south side exit with an X crossing. > > So there is no need to think about a practical max speed, you just have > to edit the proper details here.
I've fixed the Wolterholten exit. Please check whether that's ok now. -- You received this message because you are subscribed to the Google Groups "OsmAnd" group. To unsubscribe from this group and stop receiving emails from it, send an email to [email protected]. To view this discussion on the web visit https://groups.google.com/d/msgid/osmand/60597775-896b-8044-0254-9154651d9ddf%40gmx.de.
signature.asc
Description: OpenPGP digital signature
