Hi authors,

In case when the node that has the link to be overloaded is DR (for
broadcast/NBMA link case), taking this link out of service could be
disruptive. What if to modify procedure in such manner that when BDR
receives Link-Overload-sub-TLV from DR, it generates Network LSA in
advance, before taking DR role. The node with overloading link then
waits some time (for example, 3 secs) and changes its interface priority
to 0.

Thank you.

_______________________________________________
OSPF mailing list
OSPF@ietf.org
https://www.ietf.org/mailman/listinfo/ospf

Reply via email to