Hi,

Back on the 15th of March, Dan mentioned the idea of making a release in a month (http://mailman.archlinux.org/pipermail/pacman-dev/2010-March/010514.html). So, given a month has passed, lets start making plans so we can do that next month!

Things that need done before release:

1) Nagy's -D patch should be included. I am not sure what the final status of that was.

2) Revert/fix the cross-build library linking patch as this forces some linking that it should not. (perhaps consider making linking with --as-needed the default when supported too?)

3) Fix "makepkg --source" issue with split packages and install/changelog files (FS#18831) Related bugs FS#18394 and FS#16004 can be fixed at the same time. I have most of a patch prepared.

4) Pull in other stuff from working branches
    - Nagy has another couple of minor patches
    - Xavier has a couple (I am not sure about asciidoc one...)
- I have few patches (all makepkg ones are well tested, pacman -Qo "functional which" could do with a final review)

5) Tidy up bash_completion stuff?  (FS#16630)

6) Look at Flyspray roadmap: http://bugs.archlinux.org/index.php?do=index&tasks=&project=3&due=69 (I just removed package signing to 4.0...). I think the only thing not covered above is FS#15657 (presence of new db version is not checked when <dbfile>.part exists) and that is fairly minor...

7) Any other patches waiting on the mailing list?

Any other points/concerns people want to mention?

Allan

Reply via email to