Jakub M. wrote:

>OK, tried this one, but when I load netlist I see that there is only one 
>copy of analog channel and there should be 20 copies of it. Did I do 
>something wrong with the annotation?
>  
>
First, you have to instantiate the 20 sub-sheets on the main (or other) 
sheet,
then do the flatten hierarchy, which will "expand" the 20 instances of the
sheet symbol into 20 actual sheets with different names.

>Also, I do not understand how should I load this pre-made PCB (for the 
>analog channel for instance)
>
>  
>
Uhhh, it doesn't, period.  You can duplicate the pre-made block once it 
is in the
clipboard, but the reannotating is not simple or automatic.  If you 
named the
parts in the right scheme, then you can select each channel and global 
edit all the
component identifiers at once, so it takes 20 global edits.  That sounds 
awful, but
really can be done, in, maybe 10 minutes.

Jon


 
____________________________________________________________
You are subscribed to the PEDA discussion forum

To Post messages:
mailto:[email protected]

Unsubscribe and Other Options:
http://techservinc.com/mailman/listinfo/peda_techservinc.com

Browse or Search Old Archives (2001-2004):
http://www.mail-archive.com/[email protected]
 
Browse or Search Current Archives (2004-Current):
http://www.mail-archive.com/[email protected]

Reply via email to