Dan Sugalski wrote:

The parrot I have, which is a day or two out of date, takes 7m to churn through one of my pir files. With this patch, I killed the run at 19.5 minutes.

Sh... That's one of the smaller ones I presume. How many basic blocks and variables are listed with -v?


Thanks,
leo




Reply via email to