I think Jed is right. Rather than giving a list of times, it is better to 
provide user-defined callback function (or functions?) for detecting the 
non-smoothness or hitting a time before ts->final_time. MATLAB Ode solvers call 
these discontinuities as 'EVENTS' and provide callback functions to detect 
them. http://www.mathworks.com/help/matlab/ref/ode23.html. 


In the power grid project that I'm involved in, there can be three 
possibilities (could be more) when the DAE integrator needs to be stopped. 


i) An exogenous event such as a random disturbance at a given prespecified 
time. 
ii) The removal of this disturbance at another prespecified time. (only for 
analysis) 
iii) The removal of this disturbance due to some switching (switch on/off) 
based on threshold crossing (the threshold crossing and switching action could 
be at the same time or delayed). 
iv) Some switching action due to abnormal conditions. 


Later on in the project, we will be passing the states from TS at the end of 
each time step to a commercial software that decides the switching logic and 
passes the switching times back to TS PostStep() interface. Thus, there could 
be a need of stopping TS based on the switching times. 


Another example of event detection is in circuit simulation where in the zero 
crossing of the waveform needs to be detected. 


I think having callback functions for 'EVENTS' would be the right approach. 


I recently requested for a couple of features in TS and Jed, Barry, and Emil 
kindly :) agreed 
i) The feature of hitting the exact time has been added to the adaptive 
time-step controller and can be accessed via -ts_exact_final_time MATCHSTEP. 
Note that this is not available with methods that don't use an adaptive 
controller. 
ii) TS can be stopped at any given time via TSPostStep() by calling 
TSSetConvergedReason() with the flag TS_CONVERGED_USER. 


Shri 
----- Original Message -----


> On Mon, Dec 10, 2012 at 8:36 PM, Barry Smith < bsmith at mcs.anl.gov >
> wrote:



> > I'd the ability to provide to TS a list of times at which I'd like
> > the
> > ODE integrator have exactly match that time on a time-step (that is
> > adjust the delta t near that time to hit it exactly). This is
> > something Shri needs.



> Is this general enough to add to the library itself? He can write an
> adaptive controller that hits any times he wants.



> As a library feature, I'd be more interested in having a controller
> that attempted to hit the zeros of a user-provided functional (because
> that could be used for other forms of model nonsmoothness).