Harris does not free release materials from outside RCA yards during periods of 
inclement weather.

From: [email protected] [mailto:[email protected]] On Behalf Of 
Michael C Wynn
Sent: Wednesday, November 10, 2010 10:53 AM
To: [email protected]
Subject: Powernet: Outside RCA Yards - Inclement Weather

What is your site RP department guidance on releasing material/personnel from 
outside RCA yards during times of inclement weather?

For example, an outside RCA yard accessed with forklift truck and/or personnel 
during times of rain/snow and upon exiting the RCA the forklift and personnel 
must be monitored for loose surface contamination.  However, as we know when 
items are wet the potential may exist the water may mask existing loose surface 
contamination from detection.

Thank you in advance to all that respond.

Michael C. Wynn
Supervisor Radiological Analysis
Millstone Power Station
Bldg. 437/2
Rope Ferry Road
Waterford, CT 06370
Office: (860) 447-1791 Ext. 4815
Fax: (860) 444-4241
 http://www.dom.com/



CONFIDENTIALITY NOTICE: This electronic message contains information which may 
be legally confidential and/or privileged and does not in any case represent a 
firm ENERGY COMMODITY bid or offer relating thereto which binds the sender 
without an additional express written confirmation to that effect. The 
information is intended solely for the individual or entity named above and 
access by anyone else is unauthorized. If you are not the intended recipient, 
any disclosure, copying, distribution, or use of the contents of this 
information is prohibited and may be unlawful. If you have received this 
electronic transmission in error, please reply immediately to the sender that 
you have received the message in error, and delete it. Thank you.

Reply via email to