Columbia's response.

  *   what is primary method of documenting survey information, paper or 
electronic survey program? Electronic, paper is allowed during outages for 
contractors. Paper surveys are then scanned and entered into the database.
  *
  *   how does worker review survey information for job planning / prior to 
entering RCA, paper or electronic copies? Paper, we are transitioning to 
electronic but will still have paper available until the work force becomes 
familiar with the electronic maps.
  *
  *   how (in simple terms) is survey information controlled so that only most 
current survey information is available for viewing? HP Technicians update the 
electronic display after completing their routine survey for each area. The 
displays are password protected.
  *
  *   prior to entering RCA, are all workers required to interface with RP / HP 
personnel to validate radiological conditions for area(s) to be accessed? 
Survey maps are posted at the HP Access Control Point, workers are required to 
review the maps for radiological conditions in the areas they wish to access, 
fill out a TRIP ticket and check in with the HP Lead Technician prior to 
entering the RCA. The only exemptions to this process are for control room 
operators, chemistry lab workers and tool crib attendants. If a worker who is 
exempt from the RCA check-in process is required to perform tasks outside of 
the control room, chemistry lab or tool crib they are required to report to HP 
Access Control, complete a TRIP ticket and be briefed the HP Lead.
  *
  *   if interface with RP/HP, how often (every entry, shiftly), what (if any) 
groups are exempted (Ops, Chem, Security)? The entire crew is required to 
check-in upon initial entry to the RCA, if returning to perform the same task 
only one individual is required to inform the HP Lead of the work crews return 
to the RCA. If the crew changes locations or starts another job the entire crew 
will complete a new TRIP ticket and be briefed by the Lead HP Technician.
  *
  *   are trip / info tickets used for all RCA entries? Yes, except as noted in 
question #4.
  *


From: [email protected] [mailto:[email protected]] On Behalf Of 
Benjy P Bertossi
Sent: Thursday, January 17, 2013 7:13 AM
To: [email protected]
Cc: Cary M Budnik
Subject: Powernet: commnication of conditions to worker


  *   what is primary method of documenting survey information, paper or 
electronic survey program?
  *
  *   how does worker review survey information for job planning / prior to 
entering RCA, paper or electronic copies?
  *
  *   how (in simple terms) is survey information controlled so that only most 
current survey information is available for viewing?
  *
  *   prior to entering RCA, are all workers required to interface with RP / HP 
personnel to validate radiological conditions for area(s) to be accessed?
  *
  *   if interface with RP/HP, how often (every entry, shiftly), what (if any) 
groups are exempted (Ops, Chem, Security)?
  *
  *   are trip / info tickets used for all RCA entries?
  *


Thanks, Benjy

Benjy Bertossi
Fermi2 - RP Supervisor
734-586-4935
[email protected]<mailto:[email protected]>

Reply via email to