With respect to ODCM requirements, Tech Specs often allow a 25% extension for 
surveillance intervals. If a surveillance fails such that you enter an action 
statement, do any of you apply that 25% extension to the length of time the 
action
 statement requires as well?  For example, if a radiation monitor surveillance 
must be completed once every 24 hours, the Tech Spec extension allows up to 6 
extra hours to conduct the surveillance as long as the extensions are not added 
up over time.  But if
 the surveillance fails, and an action statement is entered that says “take a 
sample every 24 hours”, do you also get to extend that interval to 30 hours for 
the sample?
Thanks,  Eric M Goldin, [email protected] 
Sent from my Verizon Wireless 4G LTE smartphone

Reply via email to