With respect to ODCM requirements, Tech Specs often allow a 25% extension for
surveillance intervals. If a surveillance fails such that you enter an action
statement, do any of you apply that 25% extension to the length of time the
action
statement requires as well? For example, if a radiation monitor surveillance
must be completed once every 24 hours, the Tech Spec extension allows up to 6
extra hours to conduct the surveillance as long as the extensions are not added
up over time. But if
the surveillance fails, and an action statement is entered that says “take a
sample every 24 hours”, do you also get to extend that interval to 30 hours for
the sample?
Thanks, Eric M Goldin, [email protected]
Sent from my Verizon Wireless 4G LTE smartphone