Checking to see if there is any experience out there for manually welding the 
closure rings on a HOLTEC MPC.  Both our primary and backup AWS weld heads have 
failed and we are all stop until repairs can be made.  The closure rings have 
been installed, fit up, and tacked and the cross seam welds have been made.  
The inner and outer circumferential welds remain.  These can be welded using 
the AWS for 15 to 20 mrem.  Initial estimates for manual welding are 200 to 400 
mrem.

Note that I am not seriously considering allow this to proceed due to dose 
concerns.  Just doing due diligence to see if there is any experience in the 
industry for manually welding the closure rings and what dose reduction 
techniques were deployed.

Joel Armstrong
ALARA Engineer
Dry Cask Storage Project
Browns Ferry Nuclear Plant
(256) 729-4998 Office
(256) 497-1405 Cell

_______________________________________________
Powernet mailing list
[email protected]
http://hpspowernet.org/mailman/listinfo/powernet_hpspowernet.org