Thanks - that's the path we're on.  A complete new system is on its way here to 
Browns Ferry.

Joel Armstrong
ALARA Engineer
Dry Cask Storage Project
Browns Ferry Nuclear Plant
(256) 729-4998 Office
(256) 497-1405 Cell

From: STEVIE VAUGHAN [mailto:[email protected]]
Sent: Friday, August 03, 2018 11:04 AM
To: [email protected]
Cc: Armstrong, Joel L
Subject: RE: (External):[Powernet] Dry Cask Welding


TVA External Message. Please use caution when opening.
Joel,

I spoke with our Holtec project manager here at SONGS.  Although we have not 
had the AWS weld heads fail, we have had to have minor repairs performed.

My recommendation is aligned with yours as far as no manual welding.  From a 
dose impact prospective to personnel, the right thing to do is get a 
replacement AWS weld head rather than manual welding.

Stevie Vaughan
DA Oversight Mgr., RP, Chem., Enviro., & Waste
San Onofre Nuclear Generating Station
T. 949-368-7788 | M. 949-683-4151
5000 Pacific Coast Hwy, San Clemente, CA, 92672
[cid:[email protected]]

From: Powernet [mailto:[email protected]] On Behalf Of 
Armstrong, Joel L via Powernet
Sent: Friday, August 03, 2018 5:37 AM
To: powernet <[email protected]>
Cc: Armstrong, Joel L <[email protected]>
Subject: (External):[Powernet] Dry Cask Welding

Checking to see if there is any experience out there for manually welding the 
closure rings on a HOLTEC MPC.  Both our primary and backup AWS weld heads have 
failed and we are all stop until repairs can be made.  The closure rings have 
been installed, fit up, and tacked and the cross seam welds have been made.  
The inner and outer circumferential welds remain.  These can be welded using 
the AWS for 15 to 20 mrem.  Initial estimates for manual welding are 200 to 400 
mrem.

Note that I am not seriously considering allow this to proceed due to dose 
concerns.  Just doing due diligence to see if there is any experience in the 
industry for manually welding the closure rings and what dose reduction 
techniques were deployed.

Joel Armstrong
ALARA Engineer
Dry Cask Storage Project
Browns Ferry Nuclear Plant
(256) 729-4998 Office
(256) 497-1405 Cell

_______________________________________________
Powernet mailing list
[email protected]
http://hpspowernet.org/mailman/listinfo/powernet_hpspowernet.org

Reply via email to