Status: New
Owner: [email protected]
Labels: Type-Defect Priority-Critical Milestone-Release-1.1 Component-Validation Component-Standards-Compliance

New issue 1661 by [email protected]: Date validation is not consistent (ISAD)
http://code.google.com/p/qubit-toolkit/issues/detail?id=1661

To reproduce this error:
========================
1)Create a fonds description with the creation date 2000
2)Create a series level description with the creation date 2001, and make it a child of the fonds 3)Create an item level description with the creation date 2001, and make it a child of the fonds 4)Edit the fonds description and set the creation end date to 2002 (a create date range of 2000 - 2002)


Resulting error:
================
When the fonds creation date is 2000 (no range), the series shows no validation warning (it should), and the item shows a date validation warning (correct).

When the fonds creation date is set to 2000 - 2002, the series and item show a date validation warning (they shouldn't).

Expected result:
================
See above


--
You received this message because you are subscribed to the Google Groups "Qubit 
Toolkit Issues" group.
To post to this group, send email to [email protected].
To unsubscribe from this group, send email to 
[email protected].
For more options, visit this group at 
http://groups.google.com/group/qubit-issues?hl=en.

Reply via email to