now that i have my primer, i sprayed a few coats on the one part (that  
mounts to the mantle) and a few extra sprays on the seam between the two 1"  
couplers as it's real fine, but still visible. i'll let it dry until later  
tonight and give it a light sanding again and hopefully the next shot of paint 
 will fill it in completely.
 
i'm going to take the shorter section of the shower rod and glue some .010  
plastic strips to it as the 1" pvc pipe wigles around a bit and i want to 
get  that last part sanded down for the muzzle break. after that i just have 
t mill  out the 4 openings in it, but the milling will have to wait a few 
weeks as i  want to get one of them bi-directional clamps for the drill press, 
as i don't  want to muck it up after getting to this point. with the 2 way 
clamp (i forget  what it's called) i figure i'll get, nice straight and 
clean lines, and if  nothing else, i'll have a purdy piece waiting to get used.
 
Chris,
_Odyssey  Slipways_ (http://hometown.aol.com/odysseyslipways/index.html) 

-- 
You are currently subscribed to the "R/C Tank Combat" group.
To post a message, send email to [email protected]
To unsubscribe, send email to [email protected]
Visit the group at http://groups.google.com/group/rctankcombat

Reply via email to