Did one FW250 and that was it. No space for bus bars and it can be an issue
remebering each bit you need to order for a job. Also, the breakers are not
supposed to be mounted facing up or down in order to work properly so that
means the install has to run vertically up the wall or be on a shelf where the
inverter led indicators are not visible. E panel wins hands down even outside
the USA!
Bruce Geddes
PowerOn
_______________________________________________
List sponsored by Home Power magazine
List Address: [email protected]
Options & settings:
http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org
List-Archive: http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org
List rules & etiquette:
www.re-wrenches.org/etiquette.htm
Check out participant bios:
www.members.re-wrenches.org