wrenches,
i'm having the lamacoid labels made up for an enphase system that i am
installing and i am going with a 'rating' label on the load center which states;
Solar PV System RatingArray Rating: 660 WDCModule Rating (each): 220WDC
also a 'warning parallel system' which will also go on the load center.
i am curious what labeling others are going with for these systems. any
labeling suggestions for the soladeck j-box on the roof?
...other thoughts...- when more mods/inverters are added the 'rating' label
would need to be replaced. any suggestions for a single label that will suit a
growing system?
-when adding another mod/inverter, should an electrical permit be required each
time?(added cost) how bout a building permit?(added cost) how bout a grid
interconnect application?(no added cost)
i have been chatting with my electrical inspector and utility folks about these
micro-inverter systems and they seem fairly enthusiastic about them but the
above questions are issues we are still discussing. any comments would be
appreciated.
thanks,benn
DayStar Renewable Energy Inc. [email protected] HAVE A SUNNY DAY
_________________________________________________________________
Win a $10,000 shopping spree from Hotmail! Enter now.
http://go.microsoft.com/?linkid=9729711_______________________________________________
List sponsored by Home Power magazine
List Address: [email protected]
Options & settings:
http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org
List-Archive: http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org
List rules & etiquette:
www.re-wrenches.org/etiquette.htm
Check out participant bios:
www.members.re-wrenches.org