wrenches,
i'm having the lamacoid labels made up for an enphase system that i am 
installing and i am going with a 'rating' label on the load center which states;
Solar PV System RatingArray Rating: 660 WDCModule Rating (each): 220WDC
also a 'warning parallel system' which will also go on the load center.
i am curious what labeling others are going with for these systems.  any 
labeling suggestions for the soladeck j-box on the roof?
...other thoughts...- when more mods/inverters are added the 'rating' label 
would need to be replaced.  any suggestions for a single label that will suit a 
growing system?
-when adding another mod/inverter, should an electrical permit be required each 
time?(added cost)  how bout a building permit?(added cost)  how bout a grid 
interconnect application?(no added cost)
i have been chatting with my electrical inspector and utility folks about these 
micro-inverter systems and they seem fairly enthusiastic about them but the 
above questions are issues we are still discussing.  any comments would be 
appreciated.
thanks,benn
DayStar Renewable Energy Inc. [email protected] HAVE A SUNNY DAY







                                          
_________________________________________________________________
Win a $10,000 shopping spree from Hotmail! Enter now.
http://go.microsoft.com/?linkid=9729711
_______________________________________________
List sponsored by Home Power magazine

List Address: [email protected]

Options & settings:
http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org

List-Archive: http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org

List rules & etiquette:
www.re-wrenches.org/etiquette.htm

Check out participant bios:
www.members.re-wrenches.org

Reply via email to