Wrenches,  

Just installed a Magnum MS-PAE battery based system on an E-Panel distribution 
box and my inspector seems to have an issue with the grounding.  He is saying 
that I must run an additional GEC down to the ground rod because I am dealing 
with two separate grounding systems.  The DC and AC side of the grounding 
system shares the same ground buss bar in the E-Panel so why wouldn't a single 
GEC down to the ground rod suffice?  The buss bar is where the two systems get 
grounded together rather than at the rod.  The inspector is telling me to 
either dig up the rod and run an additional GEC down to it or connect the 
additional GEC to the existing with an irreversible splice.  Am I missing 
something here?  This requirement just seem redundant and wasteful.  If I do 
have to make the correction I will be going with the splicing option.   Some 
advise on irreversible splices would also be greatly appreciated.  I can't seem 
to source them locally and have never used them before.  Thanks for any help.   
  


Aaron Mandelkorn
NABCEP Certified PV Installer

Renewable Energy Outfitters
(970)596-3744
reoso...@gmail.com
www.reosolar.com







_______________________________________________
List sponsored by Home Power magazine

List Address: RE-wrenches@lists.re-wrenches.org

Options & settings:
http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org

List-Archive: http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org

List rules & etiquette:
www.re-wrenches.org/etiquette.htm

Check out participant bios:
www.members.re-wrenches.org

Reply via email to