I did one very similar in western Minnesota, high sand soil in an area that has 
a fairly high lightening strike count,  I ran the equipment ground back along 
with the conductors, I also used an 8" post hole digger with an extension to go 
down 5 feet, filled it with concrete around the 1.5" galvanized pipe legs and 
it is about ten feet high to top of modules, the lightening ground is the 
concrete incased electrodes,  This is a UBC 90 mph area, it is still there and 
working after more that 10 years.  So you always always need a an equipment 
ground, and I could have put a ground rod in but the concrete encased electrode 
is just fine.  
Darryl

From: Jesse Dahl <[email protected]>
To: RE-wrenches <[email protected]>
Sent: Tuesday, September 20, 2011 8:03 PM
Subject: [RE-wrenches] Grounding DPW MPM.


Hello,

I have been looking at ground mount methods lately, specifically the DPW 
Multi-Pole-Mount setup and was wondering about the method used to ground the 
modules and racking.  How is this done?   



Thanks as always!


Jesse 
_______________________________________________
List sponsored by Home Power magazine

List Address: [email protected]

Options & settings:
http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org

List-Archive: http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org

List rules & etiquette:
www.re-wrenches.org/etiquette.htm

Check out participant bios:
www.members.re-wrenches.org
_______________________________________________
List sponsored by Home Power magazine

List Address: [email protected]

Options & settings:
http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org

List-Archive: http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org

List rules & etiquette:
www.re-wrenches.org/etiquette.htm

Check out participant bios:
www.members.re-wrenches.org

Reply via email to