Hello,

I was contacted by a local co-op about installing a PV system at their
office.  At first they wanted a straight grid-tied system, and after
they received the bid they changed their minds and now want a battery based
system price. What they want now is a system that will allow them to draw
the battery bank down starting at 5pm during their peak demand time. Has
anyone worked on or installed a system of this type?


Thanks as always!


Jesse