Hello, I was contacted by a local co-op about installing a PV system at their office. At first they wanted a straight grid-tied system, and after they received the bid they changed their minds and now want a battery based system price. What they want now is a system that will allow them to draw the battery bank down starting at 5pm during their peak demand time. Has anyone worked on or installed a system of this type?
Thanks as always! Jesse
_______________________________________________ List sponsored by Home Power magazine List Address: [email protected] Change email address & settings: http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org List-Archive: http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org List rules & etiquette: www.re-wrenches.org/etiquette.htm Check out participant bios: www.members.re-wrenches.org