This is what we use - we keep a selection in the van for difficult jobs. Insulation Piercing Connector 2/0-10 AWG Part #IPCS2001 Insulation Piercing Connector 2/0-10 AWG 2/0-4 Main, 10-14 AWG Tap, Dual Rated AL9CU, Torque Limiting Nut
On Tue, May 10, 2016 at 1:27 PM, Kirpal Khalsa <[email protected]> wrote: > Hi Folks, > We have a job requiring a supply side connection. Wondering if anyone > could share some makes and models for connectors connecting to the wires > between a main meter and the main breakers in the electrical panel. > Ideally it would be able to be done hot. > I am also looking into the ConnectDer meter collar but will have to > coordinate with the utility for that and am looking to keep things simple. > Thank you!!!! > > > Sunny Regards, > Kirpal Khalsa > Oregon LRT#25 > NABCEP Certified PV Installation Professional > Oregon Solarworks LLC > www.oregonsolarworks.com > 541-299-0402 > > _______________________________________________ > List sponsored by Redwood Alliance > > List Address: [email protected] > > Change listserver email address & settings: > http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org > > List-Archive: > http://www.mail-archive.com/[email protected]/maillist.html > > List rules & etiquette: > www.re-wrenches.org/etiquette.htm > > Check out or update participant bios: > www.members.re-wrenches.org > > > -- Chris Mason NABCEP Certified Solar PV Installerâ„¢ Solar Design Engineer Generac Generators Industrial technician www.cometsolar.com <http://www.cometenergysystems.com> 264.235.5670 869.662.5670 Skype: netconcepts
_______________________________________________ List sponsored by Redwood Alliance List Address: [email protected] Change listserver email address & settings: http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org List-Archive: http://www.mail-archive.com/[email protected]/maillist.html List rules & etiquette: www.re-wrenches.org/etiquette.htm Check out or update participant bios: www.members.re-wrenches.org

