I'll rephrase this and possibly someone has a suggestion. In the Bahamas (they use CEC 2015), they are currently not allowing any load side taps in gentran switches. They suggest including a large, expensive load center with backfed breakers to combine the utility and pv ac output before connecting to the gentran. I thought I read that some people are using relays to open a circuit when the utility goes down. Is there anything ul listed that might fit this bill, or does anyone have any other ideas that are less expensive than $1500+ for each system. This is all 3 phase and most people have at least a 200 amp service.
Thanks for any suggestions, Daryl > Is anyone out there familiar enough with CEC 2015 to answer a question for > me about load side taps in a generator transfer switch? To the best of > your knowledge, is using load side taps allowed when connecting PV to the > utility side of an ATS? > > Thanks, > Daryl DeJoy > NABCEP Certified PV > Penobscot Solar Design > > _______________________________________________ > List sponsored by Redwood Alliance > > List Address: [email protected] > > Change listserver email address & settings: > http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org > > List-Archive: > http://www.mail-archive.com/[email protected]/maillist.html > > List rules & etiquette: > www.re-wrenches.org/etiquette.htm > > Check out or update participant bios: > www.members.re-wrenches.org > > _______________________________________________ List sponsored by Redwood Alliance List Address: [email protected] Change listserver email address & settings: http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org List-Archive: http://www.mail-archive.com/[email protected]/maillist.html List rules & etiquette: www.re-wrenches.org/etiquette.htm Check out or update participant bios: www.members.re-wrenches.org

