You should not have to run a EGC/GEC along the with Array Technologies. When I have installed these in the past we always mechanically bond within the bicinity of the conduit or box we are running our wiring through. No need to non-mechanically attach anywhere. Whitley Forman Bannon Specialty Electric Systems [email protected]
Sent from Yahoo Mail on Android On Wed, Apr 18, 2018 at 5:01 PM, [email protected]<[email protected]> wrote: Send RE-wrenches mailing list submissions to [email protected] To subscribe or unsubscribe via the World Wide Web, visit http://lists.re-wrenches.org/listinfo.cgi/re-wrenches-re-wrenches.org or, via email, send a message with subject or body 'help' to [email protected] You can reach the person managing the list at [email protected] When replying, please edit your Subject line so it is more specific than "Re: Contents of RE-wrenches digest..." When responding to posts within the Digest, be sure to restore the Subject: line to the original, and please edit out any extraneous lines from the quoted message. Today's Topics: 1. Re: Looking for insulated #6 bare standoff (Dave Angelini Offgrid Solar) ---------------------------------------------------------------------- Message: 1 Date: Wed, 18 Apr 2018 09:59:02 -0700 (PDT) From: "Dave Angelini Offgrid Solar" <[email protected]> To: "RE-wrenches" <[email protected]> Subject: Re: [RE-wrenches] Looking for insulated #6 bare standoff Message-ID: <[email protected]> Content-Type: text/plain;charset=iso-8859-1 Why is it #6? Usually the solar panels wire size determine Array Teks size for this wiring. What do they say please? --Dave > How about an insulated loop clamp like this one: > https://www.fastenal.com/products/details/0216763 > > You can get them in stainless and they have the rubber grommet so it won't > touch the rack. > > On Wed, Apr 18, 2018 at 12:00 PM, Dana <[email protected]> wrote: > >> Good Morning Wrenches, >> >> >> >> I am required to keep the bare #6 copper from touching the aluminum >> frame >> work of a Array Technologies tracker where it is not mechanically >> connected >> by a pass-through ground clamp on a tracking array [dissimilar metals] >> and >> am looking for a lead on an insulated standoff or strap to hold the #6 >> bare >> copper as it passes from panel to panel and rail to rail. The plans >> examiner would accept pass through clamps & this is a worst case-spendy >> solution to this. >> >> >> >> I have searched the inquired at local electrical warehouse &on the >> internet and to no avail under ???insulated strap??? & ???insulated >> cable >> standoff???. >> >> >> >> Has anyone else encountered his & what did you use? Where did you source >> this strap? >> >> >> >> I remember seeing something like this in the fuzzy past & cannot recall >> where I saw it or what it was for. >> >> >> >> Thanks for any suggestions. >> >> >> >> ------------------------------------------------------------ >> ---------------- >> >> Dana Orzel Great Solar Works, Inc. >> >> *C - 208.721.7003 [email protected] >> <[email protected]>* >> >> Idaho Contractor - # 028765 Idaho PV # 028374 >> >> NABCEP # 051112-136 www.solarwork.biz >> >> *"Responsible Technologies for Responsible People since 1988" * >> >> *P* Please consider the environment before printing this email. >> >> >> >> >> >> _______________________________________________ >> List sponsored by Redwood Alliance >> >> List Address: [email protected] >> >> Change listserver email address & settings: >> http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org >> >> List-Archive: http://www.mail-archive.com/[email protected]. >> org/maillist.html >> >> List rules & etiquette: >> www.re-wrenches.org/etiquette.htm >> >> Check out or update participant bios: >> www.members.re-wrenches.org >> >> >> > > > -- > *Will White* > Curriculum Developer > > [image: Inline image 3] > > e: [email protected] > w: www.solarenergy.org > p: 802-272-3092 > > PV Installation Professional > # 093006-34 > _______________________________________________ > List sponsored by Redwood Alliance > > List Address: [email protected] > > Change listserver email address & settings: > http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org > > List-Archive: > http://www.mail-archive.com/[email protected]/maillist.html > > List rules & etiquette: > www.re-wrenches.org/etiquette.htm > > Check out or update participant bios: > www.members.re-wrenches.org > > Dave Angelini Offgrid Solar "we go where powerlines don't" http://members.sti.net/offgridsolar/ e-mail [email protected] text 209 813 0060 ------------------------------ Subject: Digest Footer _______________________________________________ List sponsored by Redwood Alliance List Address: [email protected] Change listserver email address & settings: http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org List-Archive: http://www.mail-archive.com/[email protected]/maillist.html List rules & etiquette: www.re-wrenches.org/etiquette.htm Check out or update participant bios: www.members.re-wrenches.org ------------------------------ End of RE-wrenches Digest, Vol 11, Issue 137 ********************************************
_______________________________________________ List sponsored by Redwood Alliance List Address: [email protected] Change listserver email address & settings: http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org List-Archive: http://www.mail-archive.com/[email protected]/maillist.html List rules & etiquette: www.re-wrenches.org/etiquette.htm Check out or update participant bios: www.members.re-wrenches.org

