Tump, thank you for John's phone number from Ironridge.
I talked to Ironridge, and John confirmed that the intent here is that the
UFO and stopper sleeve needs to be 1" from the joint for an *expansion
joint only*. He did also mention that you should not have a t-bolt right on
the splice for a normal joint. It just needs to be far enough away so that
the bolt can engage properly.

Cheers,
Dave

On Wed, Mar 16, 2022 at 4:24 PM Jason Szumlanski <
ja...@floridasolardesigngroup.com> wrote:

> That's how I read it. They meant to write:
>
> "UFO and Bonding Hardware must be installed *no less than *1" away from
> the point where two Rails join together."
>
> It's frustrating when using 41.5" W modules on 168" IronRidge rails. Four
> panels just barely fit on one rail, so when splicing for more modules you
> need to cut some rail off.
>
> Jason Szumlanski
> Florida Solar Design Group
>
>
>
>
>
>
> On Wed, Mar 16, 2022 at 4:08 PM Daniel Young <da...@sesre.com> wrote:
>
>> My read on that is that the splice needs to be anywhere EXCEPT where two
>> modules meet, so for every 40” nominal module width, there is a 2”
>> exclusion zone (5% of the module width), so there is a 95% chance a random
>> splice placement will be in a good place.
>>
>>
>>
>> Basically they don’t want mid clamps right on the splice.
>>
>>
>>
>> --
>>
>>
>>
>> Danny Young
>>
>> Engineering Team Lead
>> Solar Energy Solutions
>>
>> Lexington | Louisville | Bloomington | Cincinnati | Evansville |
>> Indianapolis
>>
>> 513-448-5176 (mobile)
>>
>> 877-312-7456 (Main Office)
>>
>> da...@sesre.com
>>
>>
>>
>> *From:* RE-wrenches <re-wrenches-boun...@lists.re-wrenches.org> *On
>> Behalf Of *Dave Tedeyan
>> *Sent:* Wednesday, March 16, 2022 3:38 PM
>> *To:* RE-wrenches <re-wrenches@lists.re-wrenches.org>
>> *Subject:* [RE-wrenches] Ironridge BOSS splice
>>
>>
>>
>> Hi All,
>>
>>
>>
>> I am looking through the installation manual for Ironridge racking and
>> noticed this:
>>
>> --------
>>
>> BOSS - Bonded Structual Splice
>> Insert BOSS into first Rail up until the Stop Tab. Slide second Rail
>> fully into place.
>> ➢ Rows using Classic Splice or BOSS and exceeding 100 feet of Rail must
>> use
>> Expansion Joints.
>> ➢ Boss Splices may be installed in any location within a span.
>> ➢
>> *UFO and Bonding Hardware must be installed 1" away from the point where
>> two Rails join together.*
>>
>> *------*
>>
>> I put the third bullet point in bold. Is this saying that you need to
>> ensure that the splice ends up essentially right where two modules meet? Or
>> are they talking about for an expansion joint only? Needing to plan out the
>> exact splice locations and cut every rail to the right length seems to make
>> these splices way more difficult to work with than the normal splice, so I
>> don't get why anyone would use them.
>>
>>
>>
>> Cheers,
>>
>> Dave
>>
>>
>>
>> --
>>
>> [image: Logo]
>> <https://mailtrack.io/trace/link/4d1996105ba7f47f07eff2417581599d9b254e62?url=https%3A%2F%2Fwww.sungineersolar.com%2F&userId=1613865&signature=646c02ea29544933>
>>
>>
>> *Dave Tedeyan, P.E. Owner | Sungineer Solar*
>>
>> *p: *he | him | his
>> * a: *1653 Slaterville Rd. | Ithaca, NY 14850
>> *w:* www.sungineersolar.com
>> <https://mailtrack.io/trace/link/69d0e2be7b463666f46256049eb0e2e962ac00c6?url=http%3A%2F%2Fwww.sungineersolar.com%2F&userId=1613865&signature=29437372b0cf8d1c>
>> *c:* (607) 288-2898
>>
>>
>> _______________________________________________
>>
>> _______________________________________________
> List sponsored by Redwood Alliance
>
> Pay optional member dues here: http://re-wrenches.org
>
> List Address: RE-wrenches@lists.re-wrenches.org
>
> Change listserver email address & settings:
> http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org
>
> There are two list archives for searching. When one doesn't work, try the
> other:
> https://www.mail-archive.com/re-wrenches@lists.re-wrenches.org/
> http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org
>
> List rules & etiquette:
> http://www.re-wrenches.org/etiquette.htm
>
> Check out or update participant bios:
> http://www.members.re-wrenches.org
>
>

-- 
[image: Logo] <https://www.sungineersolar.com/>
Dave Tedeyan, P.E.
Owner | Sungineer Solar
p: he | him | his
a: 1653 Slaterville Rd. | Ithaca, NY 14850
w: www.sungineersolar.com <http://www.sungineersolar.com/>
c: (607) 288-2898
_______________________________________________
List sponsored by Redwood Alliance

Pay optional member dues here: http://re-wrenches.org

List Address: RE-wrenches@lists.re-wrenches.org

Change listserver email address & settings:
http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org

There are two list archives for searching. When one doesn't work, try the other:
https://www.mail-archive.com/re-wrenches@lists.re-wrenches.org/
http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org

List rules & etiquette:
http://www.re-wrenches.org/etiquette.htm

Check out or update participant bios:
http://www.members.re-wrenches.org

Reply via email to